Why use drone footage for solar projects?+
Solar projects often need aerial footage because system size, site geography, row layout, and surrounding infrastructure are difficult to understand from ground level alone.
Can WERZ combine drone and ground footage for solar teams?+
Yes. Drone footage can be paired with ground cinematography, interviews, still photography, and edit-ready b-roll for a complete production package.
How does WERZ price video, web, or marketing work?+
Pricing is scope-based, not template-based. We define deliverables, audience, locations, crew, and revisions before quoting — so the budget reflects actual production needs rather than a pre-set tier.
Can WERZ work from a fixed budget?+
Yes. A fixed budget works best when deliverables, locations, revision rounds, and timeline are clear before production starts. We will tell you what is achievable inside the budget rather than promise more than the scope supports.
Are there ongoing retainers, or only project work?+
Both. Most marketing and web programs run as monthly retainers (strategy, content, optimization). Video and brand projects are typically scoped per engagement, with optional content retainers for ongoing assets.
How long does a typical engagement take?+
Discovery and strategy run 1–2 weeks; production and build run 3–8 weeks depending on scope; launch and iteration kicks off after delivery. Marketing programs are ongoing with measurable milestones at month one, month three, and month six.
Can you accommodate a tight deadline?+
Yes, when the scope and approval lanes are tight. Rush projects work best when the team can lock decisions quickly and accept fewer revision rounds. We will tell you upfront if a deadline is unrealistic for the scope.
What happens after the project ships?+
Every engagement includes a 30-day post-launch window for fixes, polish, and analytics review. From there we can move into a retainer for ongoing content, optimization, or campaign management.
What does the kickoff look like?+
A 60-minute working session to lock the angle, audience, and call-to-action. You leave with a one-pager you can share internally — goal, deliverables, schedule, and success metrics.
How are revisions handled?+
Two rounds of revisions are included on most projects: rough-cut feedback and a final polish pass. Additional rounds are scoped as needed. We will tell you which revisions are scope vs. preference so you can decide what to spend on.